Why is the current basis essential?
Schneider Electric's PM800 FAQ, modified 1 July 2026, discusses a discrepancy between burden and impedance information and the current used for measurement. It uses the relationship Z = VA / I squared. Its product explanation is a reason to retain conditions, not a universal impedance or burden rating for other meters or relays.
Substation Drafting is independent and is not affiliated with Schneider Electric. Preserve the actual manufacturer's terminology, test conditions and approved engineering basis. An input burden is not the complete burden of every lead and connected device.
Sources: Schneider Electric: PM800 current-input burden at rated current, modified 1 July 2026
Which fields prevent an invalid comparison?
Trace the specific input channel and equipment revision to the approved schedule. Keep CT rated burden, connected input burden and any engineer-assessed loop burden in clearly named fields. Do not use one as evidence for all three.
| Field | Record | Check |
|---|---|---|
| Input | Equipment model, channel and revision | Avoid a generic family value |
| Burden | VA value and stated conditions | Retain the current basis |
| Impedance | Ohms and test conditions | Check magnitude and units |
| Current | Value used for the comparison | Do not omit the squared term |
| Scope | Device input or complete connected loop | Keep cable contribution separate |
| Disposition | Protection engineer's approved resolution | Do not change settings to match a table |
What changes when current changes in a simplified model?
Illustrative example. Assume a fictional constant impedance magnitude of 0.2 ohm for the arithmetic only. At 5 A, apparent burden is 5 squared x 0.2 = 5 VA. At 1 A, it is 1 squared x 0.2 = 0.2 VA. The current is five times smaller but the calculated burden is 25 times smaller under this constant-impedance assumption.
Real device impedance may depend on operating conditions. These values are not product data, a CT selection, a cable-size calculation or proof of protection performance. Do not apply the constant-impedance assumption to equipment without approved evidence.
What is the drafter's next action on a discrepancy?
Raise the exact conflicting rows and conditions to the responsible protection engineer and equipment owner. Preserve both original references. Record the approved resolution and revise the controlled drawing fields from that decision.
No CT wiring, energized test, setting change or safe-work instruction is provided here. Engineering sign-off is performed only by the registered engineer on the job.
Common questions
What else should the bid team know?
Can a VA value be compared directly with an ohm value?
No. The quantities and applicable current and conditions must be identified.
Does a device-input value represent the entire CT loop?
No. Keep the actual assessed scope explicit.
Does the example approve a CT or relay?
No. It illustrates a squared-current relationship under an invented constant-impedance assumption.
Primary sources
- PM800 current-input burden at rated current, modified 1 July 2026Schneider Electric