HV and substation drafting bureau
Electrical drawings that carry the design intent clearly.
Substation Drafting prepares single line diagrams, protection schematics and switchroom general arrangements from engineer markups and project inputs. Native drawing files, source notes and revision records stay ready for your team's review.
What comes back
Substation SLDs structured for technical review
Protection and control schematics from approved inputs
Switchroom GAs with open items made visible
Services
Defined outputs for a live bid
Each engagement starts with the documents you have and ends with a reviewable deliverable.
Substation single line diagrams
Drafting and revision of substation SLDs from engineer markups, equipment schedules and approved design inputs.
View service →02Protection and control schematics
Draft protection, trip, close, indication and interlocking circuits from approved logic and device schedules.
View service →03Switchroom general arrangements
Draft switchroom and equipment GAs from approved equipment data, site constraints and engineer markups.
View service →Illustrative example
A deliverable that can be checked line by line
This synthetic extract shows the structure. It does not represent a client, project or result.
| Requirement | Source | Action |
|---|---|---|
| Bus section arrangement | Engineer markup M-01 | Drafted for review |
| Feeder protection block | Relay schedule R-02 | Device tag check open |
| Panel access zone | Layout brief L-01 | Dimension confirmation required |
Method
Draft from controlled inputs, then review every revision
Receive the design basis
Register the markups, equipment data, drawing standard and current revision set.
Draft the drawing set
Build the SLD, schematics or GA with open decisions shown as review items.
Check and hand over
A human drafter checks the files. Engineering approval stays with the registered engineer on the job.
Field notes and tools
Useful before the bid closes
Does the full OTDR trace length equal the installed fiber length?
A substation fiber worksheet separates OTDR reference cables from installed link length using a fictional distance axis and explicit endpoint markers.
guideDoes a blocked spanning-tree port mean the cable is disconnected?
A substation network evidence worksheet distinguishes installed links from spanning-tree forwarding state without changing network or protection settings.
guideDoes a VLAN number prove that every frame on a link is tagged?
A substation communications drawing worksheet separates VLAN membership, wire tagging and port behavior without changing network or protection settings.
guideDoes an LC connector identify single-mode or multimode fiber?
A substation optical-link register separates connector, fiber mode, transceiver and operating basis before a drawing handover is accepted.
guideDoes an ICD file prove the installed IED configuration?
An IEC 61850 handover register separates ICD, CID and SCD roles, device identity and approved revision without treating a filename as proof of commissioning.
guideShould an IED port MAC address and IP address share one drawing field?
A substation IED network worksheet keeps equipment identity, physical interface, MAC record, IP record and configuration revision distinct.
Project enquiry
Tell us what is in the tender pack
Share the job type, bid stage, deliverables and closing date. A person reviews every enquiry.