What does the manufacturer example establish?

The cited EasyLogic EM64xxH meter manual lists CT primary and CT secondary as separate setup parameters, with 1 A and 5 A secondary options. It is a specific manufacturer reference, not a universal relay configuration guide. Confirm the actual ordered CT, connected ratio or tap, relay hardware and approved settings basis.

Substation Drafting is independent and is not affiliated with Schneider Electric. This article is a drawing-evidence check, not permission to change CT connections, settings or an energized circuit.

Sources: Schneider Electric: EasyLogic EM64xxH series user manual, setup parameters

Which fields must agree across the set?

Trace the exact CT core and use from the approved schedule to the schematic and relay input reference. Keep current ratings distinct from polarity, burden, accuracy class and protection settings. Matching the first number alone does not establish compatibility.

CT rating drawing reconciliation
FieldEvidenceReview action
CT identityEquipment, phase, core and approved variantUse the same device across the set
Primary ratingApproved primary current and selected ratioDo not infer an unconfirmed tap
Secondary ratingExplicit nominal secondary currentMatch the approved relay interface
Relay basisActual hardware and approved input referenceEscalate discrepancies to the protection engineer
Ratio representationBoth numbers, units and source revisionDo not abbreviate away the secondary
Other design evidenceSeparate polarity, burden and accuracy referencesDo not treat a ratio check as full design acceptance

How does a missing secondary basis change the interpretation?

Illustrative example. Under ideal ratio scaling, 300 A primary corresponds to 300 x 5 / 600 = 2.5 A secondary for a 600:5 CT. For a 600:1 CT, the same calculation is 300 x 1 / 600 = 0.5 A. These are synthetic arithmetic cases, not expected readings or CT performance guarantees.

If a drawing says only 600, the drafter cannot select either secondary value. Record the missing basis and request the approved CT and relay documentation. The calculation does not validate burden, saturation, accuracy, wiring or protection performance.

What is the safe boundary of the drafting task?

Do not alter an actual CT circuit or relay input to make an inconsistent schedule agree. Route the discrepancy to the authorized protection engineer and equipment owner. Update the controlled drawings only from their approved resolution.

Engineering sign-off is performed only by the registered engineer on the job. This worksheet improves the completeness of the issued representation; it does not provide a test procedure or an instruction for electrical work.

Common questions

What else should the bid team know?

Are 600:5 and 600:1 interchangeable because both begin with 600?

No. Their secondary bases differ and the approved interface must be checked.

Does the ratio calculation establish accuracy?

No. It is an ideal scaling illustration, not a CT performance assessment.

Should an unclear CT tap be assumed from another feeder?

No. Obtain the approved source for that exact core and connection.

Primary sources

  1. EasyLogic EM64xxH series user manual, setup parametersSchneider Electric