What does the manufacturer distinguish?

Cisco's data sheet describes different optical SFP types and separate cabling requirements. Dual LC connectors appear across optical types with different supported fiber arrangements. Its cabling and compatibility information shows why connector shape alone cannot establish an acceptable link.

Substation Drafting is independent and is not affiliated with Cisco. This is an evidence-transfer distinction, not a universal statement that every transceiver supports both fiber types or a recommendation for a particular relay. Use the actual IED, switch and approved optical design.

Sources: Cisco: Cisco SFP Modules for Gigabit Ethernet Applications Data Sheet, updated 9 October 2026

Which fields belong in the link schedule?

Record both ends and the intervening route. Keep an unknown fiber class visible instead of inferring it from a connector description or jacket color.

Which fields belong in the link schedule?
FieldControlled inputQuestion
EndpointsDevice and port at each endCorrect link identity?
OpticsApproved transceiver at each endCompatible interface pair?
FiberActual mode and applicable classCorrect optical medium?
ConnectorArrangement and required finishComplete connection basis?
RouteAccepted cable and patch referencesSame installed path?
DesignApproved loss and operating basisEngineering review complete?
HandoverDrawing and test referencesEvidence matches this link?

How can two LC labels hide an unresolved interface?

Illustrative example. A fictional protection-network drawing says LC at both ends. The cable schedule identifies multimode fiber, but one transceiver reference is missing. A reviewer signs the link complete because the connector labels match.

The document coordinator retains the known fields and asks the responsible engineer to resolve the missing optical reference. Matching connectors do not supply wavelength, supported medium, link budget or equipment compatibility. This example does not decide that the installed link fails; it identifies evidence still needed.

What should be checked after the references are supplied?

Reconcile the accepted endpoint and cable references across the link schedule, port schedule and test record. Record any changed patch or optical component through the approved change process. Keep transmit/receive routing checks separate from fiber-mode compatibility.

Do not replace transceivers, inspect energized optical ports or change protection-network connections from this guide. Engineering sign-off is performed only by the registered engineer on the job.

Common questions

What else should the bid team know?

Does LC mean single-mode?

No. Connector and fiber type are separate fields.

Do matching connector labels prove compatibility?

No. Review the approved optics, medium and operating basis.

Can jacket color replace cable documentation?

No. Retain the actual approved cable reference.

Primary sources

  1. Cisco SFP Modules for Gigabit Ethernet Applications Data Sheet, updated 9 October 2026Cisco