Which meanings of spare should the drawing separate?
A terminal may be unallocated to an outgoing cable while still having a documented connection through a bridge or another level. Reserved describes a planned allocation; unused describes a use status. Neither word alone defines every electrical relationship.
Phoenix Contact's terminal accessory guidance describes bridges distributing potential between terminal blocks and connections between levels on selected multi-level arrangements. That manufacturer example supports reviewing the selected hardware's actual connection evidence. It is not a statement that every terminal has those connections.
Substation Drafting is independent and is not affiliated with Phoenix Contact. This is a documentation worksheet, not a wiring, isolation or testing procedure. Engineering sign-off is performed only by the registered engineer on the job.
Sources: Phoenix Contact: Terminal block accessories and potential bridging
Which fields make the spare designation unambiguous?
Record the terminal and level using the approved project notation. Keep the hardware evidence, schematic and terminal schedule revisions together. Do not infer connection state from colour, adjacency or an empty cable field.
| Field | Controlled evidence | Review question |
|---|---|---|
| Terminal identity | Strip, position and level | Which connection point is described? |
| Allocation status | Allocated, reserved or unallocated under project notation | What does spare mean here? |
| External wiring | Approved cable and conductor references | Is the absence of wiring actually recorded? |
| Bridge relationship | Bridge reference and covered positions | Does a documented bridge include this point? |
| Internal connection | Selected model level or circuit evidence | Is another level connected internally? |
| Drawing state | Schematic and schedule revision | Do all records describe the same arrangement? |
| Disposition | Unresolved question and authorised response | No safety status inferred from a label |
How can a physically unused terminal have a connection?
Illustrative example. A fictional terminal schedule marks position 04 as spare because no outgoing cable is allocated. The approved schematic shows a bridge relationship covering positions 03 and 04. The reviewer records unallocated outgoing cable and documented bridge connection as separate facts. The spare label does not override the schematic.
If the bridge evidence and terminal schedule conflict, raise the exact discrepancy with the design owner. Do not remove a bridge, alter live equipment or declare a terminal isolated to make the records agree. The actual installed state and electrical safety require authorised procedures and qualified personnel.
For a multi-level terminal, review the relevant level and selected model evidence. A blank field on one level cannot establish the state of another level. Keep unknown internal connections explicitly unresolved.
What belongs in the drawing issue record?
Retain the agreed spare and reserved notation, the bridge references and any approved correction. Check affected schedules and schematics after revision, including positions that share the documented relationship. A corrected word alone may leave an inconsistent connection reference.
When the terminal model changes, reopen the model-specific connection checks. Similar appearance does not prove identical internal connections. Use the selected device documentation and approved design; do not copy assumptions from the neighbouring panel.
The worksheet establishes what the drawings say and where evidence is incomplete. It does not establish whether equipment is energised, prove isolation or authorise electrical work. Keep those operational decisions outside a documentation status field.
Common questions
What else should the bid team know?
Does spare mean safe to touch?
No. A drawing allocation label cannot establish electrical safety or isolation.
Can an empty cable field prove no connection?
No. Review bridge and internal connection evidence separately.
What if the schematic and terminal schedule disagree?
Record both revisions and obtain the authorised design disposition.