Which columns should the schedule contain?

Use the project cable register or drawing list as the starting point, then cross-check the SLD, arrangements, schematics and terminal plans.

Cable schedule fields
FieldPurposeSource
Cable IDStable identityCable register
From and toConnection boundarySLD or schematic
Type and sizeSupplied cable dataApproved schedule
RoutePhysical pathLayout or tray plan
StatusReview and issueDocument register

How should a missing cable reference be handled?

Mark the row open, cite the affected source and route the question to the responsible engineer. A schedule should not create an unapproved connection.

  • Cross-check both ends
  • Align equipment tags
  • Record source revision
  • Show unknown route
  • Route design questions

What should the final schedule review check?

Check that the cable schedule agrees with the SLD, protection schematics, arrangements and terminal information. Keep the native file and issued PDF aligned.

Common questions

What else should the bid team know?

What should a substation cable schedule include?

It should contain cable ID, from and to, type, size, route, termination, source and status.

Who reviews a substation cable schedule?

The drafter prepares it, while the engineer or project team confirms cable design and interfaces.

Does drafting approve the engineering design?

No. The responsible registered engineer makes design decisions and performs engineering sign-off.

Primary sources

  1. IEEE C2-2023 National Electrical Safety CodeIEEE Standards Association
  2. IEC 61936-1:2021International Electrotechnical Commission
  3. IEC 60617 Graphical Symbols for DiagramsInternational Electrotechnical Commission
  4. 29 CFR 1910.269Occupational Safety and Health Administration