Which inputs control the arrangement?

Use approved equipment outlines, site geometry, civil backgrounds, cable routes, maintenance access requirements and the project drawing standard. Record which inputs are preliminary.

GA input register
InputUseStatus
Equipment outlinePlan and elevationVendor revision
Civil backgroundBoundary and levelsSurvey or issued plan
Cable interfaceEntry and exitApproved route
AccessMaintenance envelopeEngineer review
Drawing ruleScale and annotationProject standard

Sources: International Electrotechnical Commission: IEC 61936-1:2021, Occupational Safety and Health Administration: 29 CFR 1910.269

How should missing dimensions be handled?

Mark missing dimensions as open inputs and reference the document needed to close them. A scaled background is not permission to infer a construction dimension.

  • Do not measure from an unscaled image
  • Distinguish supplied and assumed geometry
  • Record vendor outline revision
  • Show interface boundaries
  • Route clearance decisions to the engineer

What is the final GA check?

Check that plans, elevations, sections and schedules use the same tags and revision. Confirm that any engineering approval status is visible before issue.

Sources: IEEE Standards Association: IEEE C2-2023 National Electrical Safety Code, International Electrotechnical Commission: IEC 60617 Graphical Symbols for Diagrams

Common questions

What else should the bid team know?

Does drafting decide the substation design?

No. Drafting turns approved engineering inputs into controlled drawings. The responsible registered engineer makes design decisions and performs sign-off.

Can a drawing set use any symbol library?

Use the project drawing standard and approved symbol convention. Where a standard is specified, the project team confirms the applicable edition and licensed access.

What happens when a dimension is missing?

Show it as an open input or request the approved source. Do not invent a clearance, rating or equipment outline.

Primary sources

  1. IEEE C2-2023 National Electrical Safety CodeIEEE Standards Association
  2. IEC 61936-1:2021International Electrotechnical Commission
  3. IEC 60617 Graphical Symbols for DiagramsInternational Electrotechnical Commission
  4. 29 CFR 1910.269Occupational Safety and Health Administration