Which grounding information should be coordinated?

Use the approved grounding design, civil background, equipment arrangements, cable routes and project drawing standard. Keep supplied and open values distinct.

Grounding drawing map
AreaDrawing contentSource
GridLayout and conductor referencesGrounding design
EquipmentBond and connectionGA and detail
StructuresFence or steel bondCivil or structural input
Test pointsLocation and identifierApproved detail
NotesInstallation and evidenceProject requirement

Sources: International Electrotechnical Commission: IEC 61936-1:2021, Occupational Safety and Health Administration: 29 CFR 1910.269

What should remain with the engineer?

Grounding design values, conductor selection, touch or step assessment and engineering acceptance remain with the responsible engineer. Drafting records the approved basis.

  • Design source
  • Equipment tags
  • Conductor references
  • Connection details
  • Test responsibility

How should a missing detail be shown?

Use an open item and reference the source needed to close it. A neat plan is not evidence of an approved grounding design.

Common questions

What else should the bid team know?

What should a substation grounding drawing include?

It should show the approved layout, bonds, conductor references, test points, notes and source status.

Who reviews a substation grounding drawing?

The drafter prepares the representation, while the engineer confirms the design and sign-off.

Does drafting approve the engineering design?

No. The responsible registered engineer makes design decisions and performs engineering sign-off.

Primary sources

  1. IEEE C2-2023 National Electrical Safety CodeIEEE Standards Association
  2. IEC 61936-1:2021International Electrotechnical Commission
  3. IEC 60617 Graphical Symbols for DiagramsInternational Electrotechnical Commission
  4. 29 CFR 1910.269Occupational Safety and Health Administration