When should the checklist run?

Run it before each formal review or issue and after a markup changes the drawing basis.

Issue stages
StageCheck focusResult
DraftInput completeness and file setupReady for internal check
CheckedTags, references and drafting rulesReady for engineering review
RevisedMarkup closure and change notesReady for authorized issue

What standards does the checklist replace?

None. IEC 60617 provides an official symbol source, while IEEE C2, IEC 61936-1 and OSHA requirements address different parts of electrical safety and work. The project team selects the applicable requirements.

Sources: IEEE Standards Association: IEEE C2-2023 National Electrical Safety Code, International Electrotechnical Commission: IEC 61936-1:2021, International Electrotechnical Commission: IEC 60617 Graphical Symbols for Diagrams, Occupational Safety and Health Administration: 29 CFR 1910.269

What still needs engineering review?

Topology, ratings, protection intent, safety clearances and design compliance need the responsible engineer. The checklist prepares the drawing for that review.

Common questions

What else should the bid team know?

Does a completed checklist approve the drawing?

No. It records drafting controls. Engineering sign-off remains with the registered engineer responsible for the job.

Can the CSV be stored with the drawing register?

Yes. Rename it with the drawing set and revision so the check remains traceable.

Should every revision repeat all checks?

Repeat the controls affected by the change and the complete pre-issue check required by the customer's procedure.

Primary sources

  1. IEEE C2-2023 National Electrical Safety CodeIEEE Standards Association
  2. IEC 61936-1:2021International Electrotechnical Commission
  3. IEC 60617 Graphical Symbols for DiagramsInternational Electrotechnical Commission
  4. 29 CFR 1910.269Occupational Safety and Health Administration